← 📈 Performance: CPI, MIPS, Amdahl
Subtopic 3 of 4

6.3Average CPI

The idea

Average CPI is a weighted average of the CPI of each instruction class, weighted by how often each class occurs.

Think of it like this: Your average speed over a trip with highway and city sections.

Why it exists

Real programs mix cheap and expensive instructions; designers optimise by frequency.

How it works

  1. List classes with their fraction and CPI.
  2. CPI = Σ fraction × CPI.
  3. Time share of a class = fraction × CPI ÷ average CPI.
  4. Optimise the class with the biggest time share.

Worked example: 50% ALU (1), 30% load/store (2), 20% branch (3)

CPI = 0.5 + 0.6 + 0.6 = 1.7.

Now play with it

  • →Change the percentages and watch the time shares shift.
Mix total100 %
Average CPI1.700
MIPS1176
ALU share of time29 %
Load/store share35 %
Branch share35 %

CPI = Σ fraction × CPI. Note the share of time each class takes is not the same as its share of instructions.

Check yourself

50% ALU instructions (CPI 1), 30% load/store (CPI 2), 20% branches (CPI 3). Average CPI?

Remember: CPI = Σ (fraction × CPI).
Exam notes (the dense version)

Weighted by instruction mix.

Previous year questions: Performance: CPI, MIPS, Amdahl (3)

PYQs are grouped by topic, so this is the full set for Performance: CPI, MIPS, Amdahl; try the ones that match this subtopic. Open all 3 on the topic page.